GIBSIN undertakes assignments
in the development of new power generation for public utilities and independent
power producers. The Company also provides engineering modification services
to operating plants as part of its continuing services. Types of generation
include:
-
Conventional fossil power plants (Coal fired, Oil fired, Gas fired)
-
Combined-cycle power plants and gas turbine
-
Cogeneration plants
-
Waste to energy plants (incinerator)
-
Renewable energy power plants (Hydro power, Geothermal power, Solar PV power)
Scope of services in Power Generation includes:
- Site selection
- Feasibility study
-
Technology evaluation
-
Economical assessment
-
Environmental impact assessment
-
Plant permit application
-
Engineering and design
-
Bid evaluation management and support
-
Commissioning and Performance Witness
-
Expediting and in-service inspection
-
Technical support and training
-
Construction management and support
-
Complete Project Expertise
MAJOR EXPERIENCE LIST
GIBSIN's Experience in Power Generation
- I. Conventional Fossil Power Plants:
- A. Taiwan Power Company:
Hsinta Power Station Unit No. 1 Retrofit Biomass Energy Project
On-going
Talin Power Station Renewal Units No. 1 and 2
(2 × 800MW, Coal-fired, Ultra-Supercritical)
Completed in 2019
Taichung Power Station Units No. 9 and 10
(2 × 550MW, Coal-fired, Subcritical)
Completed in 2005
Taichung Power Station Units No. 1 ~ 8
(8 × 550MW, Coal-fired, Subcritical)
Completed in 1995
- B. Formosa Petrochemical Corporation:
Masinloc Power Project-1 Units No. 4 ~ 5, Philippines
(2 × 350MW, 2 x 984t/h, Supercritical PC Boiler, With Reheater)
On-going
FP-1 Supercritical Power Station Unit No. 1 ~ 4
(4 × 600MW, Coal-fired, Supercritical)
Completed in 2000
UP-1 Supercritical Power Station Unit No. A, B, C
(3 × 600MW, Coal-fired, Supercritical)
Completed in 2004
- C. Ho-Ping Power Company:
Ho-Ping Power Station Unit No. 1 and 2
(2 × 660MW, Coal-fired, Supercritical)
Completed in 2002
- D. Projects in Philippines:
MPGC Power Project-1 Units No. 1 ~ 4, Philippines
(4 × 150MW, 4 x 460t/h, CFB boiler, With Reheater)
On-going
Limay Power Project-1 Units No. 1 ~ 4, Philippines
(4 × 150MW, 4 x 460t/h, CFB boiler, With Reheater)
Completed in 2019
Malita Power Project-1 Units No. 1 ~ 2, Philippines
(2 × 150MW, 2 x 460t/h, CFB boiler, With Reheater)
Completed in 2016
ANDA Power Project, Philippines
(1 × 82MW, 1 × 300t/h, CFB boiler)
Completed in 2016
Toledo 1A Project, Philippines
(1 × 82MW, 1 x 300t/h, CFB boiler)
Completed in 2013
SMM Taganito THP-1 Project, Philippines
(1 × 42MW, 1 × 300t/h, CFB boiler, co-generation)
Completed in 2012
Panay Power Project-1 Units No. 1 ~ 2, Philippines
(2 × 82MW, 2 × 300t/h, CFB boiler)
Completed in 2010
- E. URS Corporation(AECOM/URS):
Springerville Power Station Unit 4, USA
(1 × 400MW, Coal-fired)
Completed in 2009
- F. Others:
Hoping Power Company, , USA
(1 × 400MW, Coal-fired)
Completed in 2009
- G. Feasibility Study:
Taiwan Power Company, Talin Power Plant Combined Cycle Units Renewal Project Feasibility Study, Taiwan
On-going
Taiwan Power Company, New Lanyu Power Plant Feasibility Study, Taiwan
On-going
- II. Combined-cycle power plants and gas turbine
- A. Taiwan Power Company:
Talin Combined-cycle Generation Renewal Unit No. 1 ~ 2, Taiwan
(1,100~1,400MW, LNG-fired)
On-going
New TPC Tunghsiao Aeroderivative Gas Turbine Generating Package, Taiwan
(6 × 30MW, LNG-fired)
On-going
New TPC Tunghsiao Combined-cycle Generation Unit No. 4 ~ 9, Taiwan
(6 × 500MW, LNG-fired)
On-going
Hsinta Combined-cycle Generation Renewal Unit No. 1 ~ 3, Taiwan
(3 × 1100MW, LNG-fired)
On-going
Datan Combined-cycle Generation Unit No. 7 ~ 9, Taiwan
(1 × 900MW, 2 × 1100MW, LNG-fired)
On-going
New TPC Tunghsiao Combined-cycle Generation Unit No. 1 ~ 3, Taiwan
(3 × 900MW, LNG-fired)
On-going
Datan Combined-cycle Generation Unit No. 1 ~ 6, Taiwan
(2 × 740MW, 4 × 725MW, LNG-fired)
Completed in 2008
Nanpu Single Shaft Combined-cycle Generation Unit No. 4, Taiwan
(1 × 250MW, LNG-fired)
Completed in 2003
Linkou Gas Turbine Generation Unit No. 1 and 2, Taiwan
(2 × 150MW, Oil-fired)
Completed in 1998
- B. Chiahui Power Company:
Chiahui Combined-cycle Power Plant Unit No. 2
(1 × 500MW, LNG-fired)
Completed in 2021
Chiahui Combined-cycle Power Plant Unit No. 1
(1 × 670MW, LNG-fired)
Completed in 2004
- C. Star Buck Power Corporation:
Star Buck Combined-cycle Power Plant, Taiwan
(1 × 490MW, LNG-fired)
Completed in 2009
- D. URS Corporation(AECOM/URS):
ALLIANT RECE Combined Cycle Project, USA
(1 × 650MW, LNG-fired)
On-going
- E. Marubeni:
South Bangkok Power Plant Phase 1 Replacement Unit No.1 and 2
(2 × 650MW, LNG-fired)
On-going
- III. Cogeneration Plants:
SEC, Taiyen Cogeneration Plant, Taiwan(1 x 55t/h, Gas-fired)
Completed in 2022
Long Chen Paper Co. (LCPC) Paper Mill New Cogeneration Plant, Taiwan
(1 × 20MW, 1 × 100t/h)
Completed in 2016
Dragon Steel Corporation, Cogeneration Plant Engineering Service for Stage 2 Phase 2 Expansion Project, Taiwan.
Completed in 2013
Dragon Steel Corporation, Utility Engineering Service for Stage 2 Phase 2 Expansion Project, Taiwan.
Completed in 2013
FHI, SMM Taganito THP-1 Project, Philippines
(1 × 42MW, 1 × 300t/h, CFB boiler)
Completed in 2012
FHS, Cogeneration Plant, Ha Tinh, Vietnam
(1 × 42MW, 1 × 300t/h, CFB boiler)
Completed in 2012
Far Eastern Textile Ltd., Hsinpu Fiber Plant Cogeneration Plant, Taiwan
(1 × 420t/h)
Completed in 2011
URS, Suncor Firebag Stage 3 Cogeneration Units No. 1 and 2, USA
(2 × 80MW, Coal-fired)
Completed in 2010
Dragon Steel Corporation, Utility Engineering Service for Stage 2 Phase 1 Expansion Project, Taiwan.
Completed in 2010
- IV. Waste to Energy Plants:
Taiwan Cube Energy, Taiyuan WtE Power Plant, Taiwan (Using RDF)
On-going
Sinotech, Macau Refuse Incineration Plant 3rd Phase Expansion Project, Macau.
On-going
Tuntex Distinct Corporation, Kaohsiung Central District Recovery Plant, Taiwan.
Completed in 2010
- V. Hydro Power Plants:
Taiwan Power Company, Mingtan Hydro Power Plant Chou-Shuei Renewal Project.
Completed in 2016
- VI. Geothermal Power Plants:
Toshiba, Lumut Balai Geothermal Power Plant Project, Indonesia
(200MW, Geothermal)
Completed in 2017
- VII. Solar PV Power Plants:
Tatung Corporation, TaiYen Tainan Yu-Guang Section 40MW Solar PV Power Plant, Taiwan.
On-going
- VIII. Offshore Wind Farm:
Taiwan Power Company, Changhua Phase II Offshore Wind Farm (Owner's Engineer Services)
On-going