GIBSIN undertakes assignments in the development of new power generation for public utilities and independent power producers. The Company also provides engineering modification services to operating plants as part of its continuing services. Types of generation include:

  • Conventional fossil power plants (Coal fired, Oil fired, Gas fired)
  • Combined-cycle power plants and gas turbine
  • Cogeneration plants
  • Waste to energy plants (incinerator)
  • Renewable energy power plants (Hydro power, Geothermal power, Solar PV power)

Scope of services in Power Generation includes:

  • Site selection
  • Feasibility study
  • Technology evaluation
  • Economical assessment
  • Environmental impact assessment
  • Plant permit application
  • Engineering and design
  • Bid evaluation management and support
  • Commissioning and Performance Witness
  • Expediting and in-service inspection
  • Technical support and training
  • Construction management and support
  • Complete Project Expertise

MAJOR EXPERIENCE LIST

GIBSIN's Experience in Power Generation

  • I. Conventional Fossil Power Plants:
  • A. Taiwan Power Company:
  • Hsinta Power Station Unit No. 1 Retrofit Biomass Energy Project
    On-going
  • Talin Power Station Renewal Units No. 1 and 2
    (2 × 800MW, Coal-fired, Ultra-Supercritical)
    Completed in 2019
  • Taichung Power Station Units No. 9 and 10
    (2 × 550MW, Coal-fired, Subcritical)
    Completed in 2005
  • Taichung Power Station Units No. 1 ~ 8
    (8 × 550MW, Coal-fired, Subcritical)
    Completed in 1995
  • B. Formosa Petrochemical Corporation:
  • Masinloc Power Project-1 Units No. 4 ~ 5, Philippines
    (2 × 350MW, 2 x 984t/h, Supercritical PC Boiler, With Reheater)
    On-going
  • FP-1 Supercritical Power Station Unit No. 1 ~ 4
    (4 × 600MW, Coal-fired, Supercritical)
    Completed in 2000
  • UP-1 Supercritical Power Station Unit No. A, B, C
    (3 × 600MW, Coal-fired, Supercritical)
    Completed in 2004
  • C. Ho-Ping Power Company:
  • Ho-Ping Power Station Unit No. 1 and 2
    (2 × 660MW, Coal-fired, Supercritical)
    Completed in 2002
  • D. Projects in Philippines:
  • MPGC Power Project-1 Units No. 1 ~ 4, Philippines
    (4 × 150MW, 4 x 460t/h, CFB boiler, With Reheater)
    On-going
  • Limay Power Project-1 Units No. 1 ~ 4, Philippines
    (4 × 150MW, 4 x 460t/h, CFB boiler, With Reheater)
    Completed in 2019
  • Malita Power Project-1 Units No. 1 ~ 2, Philippines
    (2 × 150MW, 2 x 460t/h, CFB boiler, With Reheater)
    Completed in 2016
  • ANDA Power Project, Philippines
    (1 × 82MW, 1 × 300t/h, CFB boiler)
    Completed in 2016
  • Toledo 1A Project, Philippines
    (1 × 82MW, 1 x 300t/h, CFB boiler)
    Completed in 2013
  • SMM Taganito THP-1 Project, Philippines
    (1 × 42MW, 1 × 300t/h, CFB boiler, co-generation)
    Completed in 2012
  • Panay Power Project-1 Units No. 1 ~ 2, Philippines
    (2 × 82MW, 2 × 300t/h, CFB boiler)
    Completed in 2010
  • E. URS Corporation(AECOM/URS):
  • Springerville Power Station Unit 4, USA
    (1 × 400MW, Coal-fired)
    Completed in 2009
  • F. Others:
  • Hoping Power Company, , USA
    (1 × 400MW, Coal-fired)
    Completed in 2009
  • G. Feasibility Study:
  • Taiwan Power Company, Talin Power Plant Combined Cycle Units Renewal Project Feasibility Study, Taiwan
    On-going
  • Taiwan Power Company, New Lanyu Power Plant Feasibility Study, Taiwan
    On-going
  •  

  • II. Combined-cycle power plants and gas turbine
  • A. Taiwan Power Company:
  • Talin Combined-cycle Generation Renewal Unit No. 1 ~ 2, Taiwan
    (1,100~1,400MW, LNG-fired)
    On-going
  • New TPC Tunghsiao Aeroderivative Gas Turbine Generating Package, Taiwan
    (6 × 30MW, LNG-fired)
    On-going
  • New TPC Tunghsiao Combined-cycle Generation Unit No. 4 ~ 9, Taiwan
    (6 × 500MW, LNG-fired)
    On-going
  • Hsinta Combined-cycle Generation Renewal Unit No. 1 ~ 3, Taiwan
    (3 × 1100MW, LNG-fired)
    On-going
  • Datan Combined-cycle Generation Unit No. 7 ~ 9, Taiwan
    (1 × 900MW, 2 × 1100MW, LNG-fired)
    On-going
  • New TPC Tunghsiao Combined-cycle Generation Unit No. 1 ~ 3, Taiwan
    (3 × 900MW, LNG-fired)
    On-going
  • Datan Combined-cycle Generation Unit No. 1 ~ 6, Taiwan
    (2 × 740MW, 4 × 725MW, LNG-fired)
    Completed in 2008
  • Nanpu Single Shaft Combined-cycle Generation Unit No. 4, Taiwan
    (1 × 250MW, LNG-fired)
    Completed in 2003
  • Linkou Gas Turbine Generation Unit No. 1 and 2, Taiwan
    (2 × 150MW, Oil-fired)
    Completed in 1998
  • B. Chiahui Power Company:
  • Chiahui Combined-cycle Power Plant Unit No. 2
    (1 × 500MW, LNG-fired)
    Completed in 2021
  • Chiahui Combined-cycle Power Plant Unit No. 1
    (1 × 670MW, LNG-fired)
    Completed in 2004
  • C. Star Buck Power Corporation:
  • Star Buck Combined-cycle Power Plant, Taiwan
    (1 × 490MW, LNG-fired)
    Completed in 2009
  • D. URS Corporation(AECOM/URS):
  • ALLIANT RECE Combined Cycle Project, USA
    (1 × 650MW, LNG-fired)
    On-going
  • E. Marubeni:
  • South Bangkok Power Plant Phase 1 Replacement Unit No.1 and 2
    (2 × 650MW, LNG-fired)
    On-going
  •  

  • III. Cogeneration Plants:
  • SEC, Taiyen Cogeneration Plant, Taiwan(1 x 55t/h, Gas-fired)
    Completed in 2022
  • Long Chen Paper Co. (LCPC) Paper Mill New Cogeneration Plant, Taiwan
    (1 × 20MW, 1 × 100t/h)
    Completed in 2016
  • Dragon Steel Corporation, Cogeneration Plant Engineering Service for Stage 2 Phase 2 Expansion Project, Taiwan.
    Completed in 2013
  • Dragon Steel Corporation, Utility Engineering Service for Stage 2 Phase 2 Expansion Project, Taiwan.
    Completed in 2013
  • FHI, SMM Taganito THP-1 Project, Philippines
    (1 × 42MW, 1 × 300t/h, CFB boiler)
    Completed in 2012
  • FHS, Cogeneration Plant, Ha Tinh, Vietnam
    (1 × 42MW, 1 × 300t/h, CFB boiler)
    Completed in 2012
  • Far Eastern Textile Ltd., Hsinpu Fiber Plant Cogeneration Plant, Taiwan
    (1 × 420t/h)
    Completed in 2011
  • URS, Suncor Firebag Stage 3 Cogeneration Units No. 1 and 2, USA
    (2 × 80MW, Coal-fired)
    Completed in 2010
  • Dragon Steel Corporation, Utility Engineering Service for Stage 2 Phase 1 Expansion Project, Taiwan.
    Completed in 2010
  •  

  • IV. Waste to Energy Plants:
  • Taiwan Cube Energy, Taiyuan WtE Power Plant, Taiwan (Using RDF)
    On-going
  • Sinotech, Macau Refuse Incineration Plant 3rd Phase Expansion Project, Macau.
    On-going
  • Tuntex Distinct Corporation, Kaohsiung Central District Recovery Plant, Taiwan.
    Completed in 2010
  •  

  • V. Hydro Power Plants:
  • Taiwan Power Company, Mingtan Hydro Power Plant Chou-Shuei Renewal Project.
    Completed in 2016
  •  

  • VI. Geothermal Power Plants:
  • Toshiba, Lumut Balai Geothermal Power Plant Project, Indonesia
    (200MW, Geothermal)
    Completed in 2017
  •  

  • VII. Solar PV Power Plants:
  • Tatung Corporation, TaiYen Tainan Yu-Guang Section 40MW Solar PV Power Plant, Taiwan.
    On-going
  •  

  • VIII. Offshore Wind Farm:
  • Taiwan Power Company, Changhua Phase II Offshore Wind Farm (Owner's Engineer Services)
    On-going