GIBSIN undertakes assignments
in the development of new power generation for public utilities and independent
power producers. The Company also provides engineering modification services
to operating plants as part of its continuing services. Types of generation
include:
-
Conventional fossil power plants (Coal fired, Oil fired, Gas fired)
-
Combined-cycle power plants and gas turbine
-
Cogeneration plants
-
Waste to energy plants (incinerator)
-
Renewable energy power plants (Hydro power, Geothermal power, Solar PV power)
Scope of services in Power Generation includes:
- Site selection
- Feasibility study
-
Technology evaluation
-
Economical assessment
-
Environmental impact assessment
-
Plant permit application
-
Engineering and design
-
Bid evaluation management and support
-
Commissioning and Performance Witness
-
Expediting and in-service inspection
-
Technical support and training
-
Construction management and support
-
Complete Project Expertise
MAJOR EXPERIENCE LIST
GIBSIN's Experience in Power Generation
- I. Conventional Fossil Power Plants:
A. Taiwan Power Company:

Hsinta Power Station Unit No. 1 Retrofit Biomass Energy Project

On-going

Talin Power Station Renewal Units No. 1 and 2

(2 × 800MW, Coal-fired, Ultra-Supercritical)

Completed in 2019

Taichung Power Station Units No. 9 and 10

(2 × 550MW, Coal-fired, Subcritical)

Completed in 2005

Taichung Power Station Units No. 1 ~ 8

(8 × 550MW, Coal-fired, Subcritical)

Completed in 1995
B. Formosa Petrochemical Corporation:

Masinloc Power Project-1 Units No. 4 ~ 5, Philippines

(2 × 350MW, 2 x 984t/h, Supercritical PC Boiler, With Reheater)

On-going

FP-1 Supercritical Power Station Unit No. 1 ~ 4

(4 × 600MW, Coal-fired, Supercritical)

Completed in 2000

UP-1 Supercritical Power Station Unit No. A, B, C

(3 × 600MW, Coal-fired, Supercritical)

Completed in 2004
C. Ho-Ping Power Company:

Ho-Ping Power Station Unit No. 1 and 2

(2 × 660MW, Coal-fired, Supercritical)

Completed in 2002
D. Projects in Philippines:

MPGC Power Project-1 Units No. 1 ~ 4, Philippines

(4 × 150MW, 4 x 460t/h, CFB boiler, With Reheater)

On-going

Limay Power Project-1 Units No. 1 ~ 4, Philippines

(4 × 150MW, 4 x 460t/h, CFB boiler, With Reheater)

Completed in 2019

Malita Power Project-1 Units No. 1 ~ 2, Philippines

(2 × 150MW, 2 x 460t/h, CFB boiler, With Reheater)

Completed in 2016

ANDA Power Project, Philippines

(1 × 82MW, 1 × 300t/h, CFB boiler)

Completed in 2016

Toledo 1A Project, Philippines

(1 × 82MW, 1 x 300t/h, CFB boiler)

Completed in 2013

SMM Taganito THP-1 Project, Philippines

(1 × 42MW, 1 × 300t/h, CFB boiler, co-generation)

Completed in 2012

Panay Power Project-1 Units No. 1 ~ 2, Philippines

(2 × 82MW, 2 × 300t/h, CFB boiler)

Completed in 2010
E. URS Corporation(AECOM/URS):

Springerville Power Station Unit 4, USA

(1 × 400MW, Coal-fired)

Completed in 2009
F. Others:

Hoping Power Company, , USA

(1 × 400MW, Coal-fired)

Completed in 2009
G. Feasibility Study:

Taiwan Power Company, Talin Power Plant Combined Cycle Units Renewal Project Feasibility Study, Taiwan

On-going

Taiwan Power Company, New Lanyu Power Plant Feasibility Study, Taiwan

On-going
- II. Combined-cycle power plants and gas turbine
A. Taiwan Power Company:

Taichung Combined-cycle Generation Unit No. 3 ~ 6, Taiwan

(4,800~5,500MW, LNG-fired)

On-going

Talin Combined-cycle Generation Renewal Unit No. 1 ~ 2, Taiwan

(1,100~1,400MW, LNG-fired)

On-going

New TPC Tunghsiao Aeroderivative Gas Turbine Generating Package, Taiwan

(6 × 30MW, LNG-fired)

On-going

New TPC Tunghsiao Combined-cycle Generation Unit No. 4 ~ 9, Taiwan

(6 × 500MW, LNG-fired)

On-going

Hsinta Combined-cycle Generation Renewal Unit No. 1 ~ 3, Taiwan

(3 × 1100MW, LNG-fired)

On-going

Datan Combined-cycle Generation Unit No. 7 ~ 9, Taiwan

(1 × 900MW, 2 × 1100MW, LNG-fired)

On-going

New TPC Tunghsiao Combined-cycle Generation Unit No. 1 ~ 3, Taiwan

(3 × 900MW, LNG-fired)

On-going

Datan Combined-cycle Generation Unit No. 1 ~ 6, Taiwan

(2 × 740MW, 4 × 725MW, LNG-fired)

Completed in 2008

Nanpu Single Shaft Combined-cycle Generation Unit No. 4, Taiwan

(1 × 250MW, LNG-fired)

Completed in 2003

Linkou Gas Turbine Generation Unit No. 1 and 2, Taiwan

(2 × 150MW, Oil-fired)

Completed in 1998
B. Chiahui Power Company:

Chiahui Combined-cycle Power Plant Unit No. 2

(1 × 500MW, LNG-fired)

Completed in 2021

Chiahui Combined-cycle Power Plant Unit No. 1

(1 × 670MW, LNG-fired)

Completed in 2004
C. Star Buck Power Corporation:

Star Buck Combined-cycle Power Plant, Taiwan

(1 × 490MW, LNG-fired)

Completed in 2009
D. URS Corporation(AECOM/URS):

ALLIANT RECE Combined Cycle Project, USA

(1 × 650MW, LNG-fired)

On-going
E. Marubeni:

South Bangkok Power Plant Phase 1 Replacement Unit No.1 and 2

(2 × 650MW, LNG-fired)

On-going
- III. Cogeneration Plants:

SEC, Taiyen Cogeneration Plant, Taiwan(1 x 55t/h, Gas-fired)

Completed in 2022

Long Chen Paper Co. (LCPC) Paper Mill New Cogeneration Plant, Taiwan

(1 × 20MW, 1 × 100t/h)

Completed in 2016

Dragon Steel Corporation, Cogeneration Plant Engineering Service for Stage 2 Phase 2 Expansion Project, Taiwan.

Completed in 2013

Dragon Steel Corporation, Utility Engineering Service for Stage 2 Phase 2 Expansion Project, Taiwan.

Completed in 2013

FHI, SMM Taganito THP-1 Project, Philippines

(1 × 42MW, 1 × 300t/h, CFB boiler)

Completed in 2012

FHS, Cogeneration Plant, Ha Tinh, Vietnam

(1 × 42MW, 1 × 300t/h, CFB boiler)

Completed in 2012

Far Eastern Textile Ltd., Hsinpu Fiber Plant Cogeneration Plant, Taiwan

(1 × 420t/h)

Completed in 2011

URS, Suncor Firebag Stage 3 Cogeneration Units No. 1 and 2, USA

(2 × 80MW, Coal-fired)

Completed in 2010

Dragon Steel Corporation, Utility Engineering Service for Stage 2 Phase 1 Expansion Project, Taiwan.

Completed in 2010
- IV. Waste to Energy Plants:

Taiwan Cube Energy, Taiyuan WtE Power Plant, Taiwan (Using RDF)

On-going

Sinotech, Macau Refuse Incineration Plant 3rd Phase Expansion Project, Macau.

On-going

Tuntex Distinct Corporation, Kaohsiung Central District Recovery Plant, Taiwan.

Completed in 2010
- V. Hydro Power Plants:

Taiwan Power Company, Mingtan Hydro Power Plant Chou-Shuei Renewal Project.

Completed in 2016
- VI. Geothermal Power Plants:

Toshiba, Lumut Balai Geothermal Power Plant Project, Indonesia

(200MW, Geothermal)

Completed in 2017
- VII. Solar PV Power Plants:

Tatung Corporation, TaiYen Tainan Yu-Guang Section 40MW Solar PV Power Plant, Taiwan.

On-going
- VIII. Offshore Wind Farm:

Synera Renewable Energy (SRE), Formosa 6 Offshore Wind Farm (Onshore facilities FEED study)

On-going

Synera Renewable Energy (SRE), Formosa 4 Offshore Wind Farm (Reviewing and technical service for onshore facilities)

On-going

Taiwan Power Company, Changhua Phase II Offshore Wind Farm (Owner's Engineer Services)

On-going